Exit criteria ensures that the testing of the application is completed and ready.

1. All the planned requirements must be met

2. All the high Priority bugs should be closed

3. All the test cases should be executed

4. If the scheduled time out is arrived

5. Test manager must sign off the release


종료 기준은 어플리케이션 테스트이 완료되고 준비되었음을 보장한다.

1. 계획된 모든 요구사항들이 만족되어야 한다.
2. 모든 높은 우선순위의 버그들이 종료되어야 한다.
3. 모든 테스트 케이스들이 실행되어야 한다.
4. 예정된 종료시간이 되었다.
5. 테스트 매니저가 출시를 선언해야 한다.



Entrance criteria:

1)All source codes are unit tested

2)All QA resource has enought functional knowledge

3)H/W and s/w are in place

4)Test plans and test cases are reviewed and signed off



Exit criteria:

1)No defect over a perod of time or testing effort

2)Planned deliverables are ready

3)High severity defects are fixed

 

RE: What are Entry and Exit criteria in Test Plan?

Entry Criteria :
It ensures that the proper environment is in place to support the entire system test process. Item must meet in entry criteria:

    * All test hardware platforms must have been successfully installed, configured and Functioning properly.
    * All standard software tools including testing tools must have been successfully installed and functioning properly.
    * All documentation and design of the architecture must be made available.
    * All personnel involved in the system test effort must be trained in tools to be used during testing process.
    * A separate QA environment (with its own webserver, database and Application server instance) must be available.
    *Proper test data is available.

테스트 플랜에서 시작기준과 종료기준은 무엇인가?

시작기준:
전체 시스템 테스트 프로세스를 뒷받침하기 위해 적합한 환경이 준비되었음을 보장한다. 다음 항목들이 시작 기준에 만족되어야 한다.

- 모든 테스트 하드웨어 플랫폼들이 성공적으로 설치, 설정 그리고 적절히 동작해야 한다.
- 테스팅 툴을 포함한 모든 표준 소프트웨어가 성공적으로 설치되고 적절하게 동작해야 한다.
- 개발자의 모든 문서와 설계서가 사용할 수 있도록 준비되어야 한다.
- 시스템 테스트 시도에 관련된 모든 개개인이 테스트 프로세스 진행 과정에서 사용될 도구들에 숙련되어져야 한다.
- 독립된 QA환경이 마련되어야 한다.(그들만의 웹서버, 데이터베이스 그리고 어플리케이션 서버 등)
- 적합한 테스트 데이터가 준비되어야 한다.


Exit Criteria:

It ensures that the project application has been satisfactorily completed before exiting the system test stage and clarifying the application as complete. Items must be meet:

    *Application must provide the required services.
    * Ensure all application documentation has been completed and is upto date.
    * 100% of all Priority 1 and priority 2 bugs must be resolved.

 종료기준:
시스템 테스트 과정을 종료하고 어플리케이션이 완전하다고 간주하기 전에 그 프로젝트 목적이 만족스럽게 완수되었다는 것을 보장한다.

*어플리케이션이 요구된 서비스들을 제공해야한다.
*모든 어플리케이션 문서가 작성되고 최신으로 갱신되었음을 보장한다.
*최고의 우선순위를 가진 버그들이 100% 해결되어야 한다.




The Entrance Criteria specified by the system test controller, should be fulfilled before System Test can commence. In the event, that any criterion has not been achieved, the System Test may commence if Business Team and Test Controller are in full agreement that the risk is manageable.

* All developed code must be unit tested. Unit and Link Testing must be completed and signed off by development team.
* System Test plans must be signed off by Business Analyst and Test Controller.
* All human resources must be assigned and in place.
* All test hardware and environments must be in place, and free for System test use.
* The Acceptance Tests must be completed, with a pass rate of not less than 80%.

The Exit Criteria detailed below must be achieved before the Phase 1 software can be recommended for promotion to Operations Acceptance status. Furthermore, I recommend that there be a minimum 2 days effort Final Integration testing AFTER the final fix/change has been retested.

* All High Priority errors from System Test must be fixed and tested
* If any medium or low-priority errors are outstanding - the implementation risk must be signed off as acceptable by Business Analyst and Business Expert
* Project Integration Test must be signed off by Test Controller and Business Analyst.
* Business Acceptance Test must be signed off by Business Expert.

시스템 테스트 관리자에 의해 규정된 시작 기준은 시스템 테스트가 개시되기 전에 만족되어져야 한다. 만일 비즈니스 팀과 테스트 관리팀이 리스크가 관리 가능하다고 완전히 합의한다면, 어떤 기준이 잡혀져 있지 않은 상황일지라도 시스템 테스트가 개시될 수 도 있다.

* 개발된 모든 코드는 단위 테스트를 해야한다. 단위 그리고 링크 테스팅이 완료되고 개발팀에 의한 승인되어야 한다.
* 시스템 테스트 플랜이 비즈니스 분석가와 테스트 관리자에 의해 승인되어야 한다.
* 모든 인적 자원들이 할당되고 준비되어야 한다.
* 모든 테스트 하드웨어와 환경이 준비되어야 하고, 시스템 테스트 활용에 자유로워야 한다.
* 80% 이상의 통과율로 인수 테스트가 완료되어야 한다.

아래에 자세히 설명된 종료 기준은 소프트웨어가 수행 허용 상태로 이관되기 위해 권장될 수 있는 1단계 이전에 완수되어야 한다. 게다가 나는 최종적인 수정/변경이 다시 테스트 된 다음 최종 통합 테스트를 위한 최소 2일을 남겨놓기를 권장한다.

* 시스템 테스트에서 발견된 높은 우선순위를 가진 모든 오류들이 수정되고 테스트되어야 한다.
* 만일 중간이나 낮은 우선순위를 가진 몇몇 에러들이 눈에 띈다면, 비즈니스 분석가와 비즈니스 전문가에 의해 납득되었다는 의미로 이행 리스크가 승인되어야 한다.
* 프로젝트 통합 테스트가 테스트 관리자와 비즈니스 분석가에 의해 승인되어야 한다.
* 비즈니스 인수 테스트가 비즈니스 전문가에 의해 승인되어야 한다.

'IT와 생활' 카테고리의 다른 글

MS SQL 서버 버전 확인하기  (0) 2009.01.06
S/W 벤치마크테스트 평가모델 개발 이슈  (0) 2008.12.12
Severity Vs Priority  (0) 2008.11.03
Entry and Exit Criteria  (0) 2008.11.03
Benchmark (벤치마크)  (0) 2008.10.30

WRITTEN BY
하이런

,